Infrastructure · Use Cases

What Can Be Built at Resita?

The site's grid profile — 650 MVA adjacent, three 400 kV corridors, river cooling — supports the most demanding data center use cases.

01

AI Training Clusters

Large-scale GPU clusters for foundation model training require 50–200+ MW of uninterruptible power, high-density liquid cooling, and low-latency interconnect. The Resita site's grid profile and river water access match this requirement profile.

AI Training →
02

HPC Computing

High-performance computing for scientific simulation, weather modelling, financial risk, and energy exploration requires dense compute with reliable power and high-bandwidth networking. 650 MVA grid adjacency removes the primary constraint.

HPC Computing →
03

Colocation

EU-jurisdiction colocation at competitive OPEX. Romanian industrial electricity prices (~€0.14/kWh) and lower land costs enable a cost structure that Bucharest, Frankfurt, or Amsterdam cannot replicate at scale.

Colocation →

Site Specifications Summary

Confirmed
650 MVA
Adjacent substation
Confirmed
~3 ha
Project footprint
Confirmed
3.63 m³/s
River flow (cooling)
Confirmed
Industrial
Zoning — no rezoning
Confirmed
EU
Jurisdiction & GDPR