Comparison · Within Romania

Resita vs Bucharest

A direct comparison for developers evaluating Romanian data center locations: grid, land, cooling, and strategic position.

FactorResita (this site)Bucharest
Grid capacity (adjacent)650 MVA confirmed · 400/220/110 kVUrban substations: congested · new HV requires new infra
Land availability~3 ha industrial zone · no rezoningLimited urban perimeter · rezoning often required
Electricity price~€0.14/kWh (same national tariff)~€0.14/kWh (same national tariff)
EU PCI projects4 PCI designations · ENTSO-E P144No equivalent in Bucharest corridor
Water coolingBârzava: 3.63 m³/s mean annual flowNo river cooling resource in urban perimeter
Climate (cooling baseline)Lower ambient · Banat Montan microclimateContinental · hotter summers increase cooling load
Municipal supportStrategic Partnership signed 27.03.2026No equivalent formal agreement
ATR statusInitiated April 2026Developer-initiated from scratch
Network connectivityRegional · adequate for training workloadsBest national hub · major carrier PoPs
Land costSecondary city · significantly lowerUrban industrial · higher · limited

Summary: Resita wins on grid capacity, water cooling, land cost, and EU PCI corridor. Bucharest wins on network connectivity. For power-intensive AI and HPC workloads, Resita's profile is materially stronger.

Romania vs Western Europe → · Request full briefing →