18 months of origination
The work behind a site ready to move.
Site origination is invisible work. This is the documented chronology from the October 2024 municipal mandate to today.
Municipal mandate — Confidentiality Agreement
Mayor Ioan Popa signed a Confidentiality Agreement with the founder to coordinate, document and promote a data center project on Reșița's behalf before international developers and infrastructure funds.
- NDA signed · official stamp
- Coordinator mandate · Banat Montan
Site identification — Calea Caransebeșului Km 7.5
The perimeter selected after regional mapping of all Transelectrica 400 kV nodes. Decisive factor: the adjacent 650 MVA substation upgraded by Transelectrica in 2024. The ~31-hectare perimeter is in municipal private-domain ownership; no rezoning required.
- 650 MVA substation ↗ Economica.net
- Industrial zoning confirmed
- Municipal private domain
Grid & regulatory documentation
Three 400 kV corridors documented from public records. Four EU PCI designations (ENTSO-E TYNDP P144) verified. ATR procedure under ANRE Order 59/2013 mapped. Romania industrial electricity ~€0.14/kWh vs EU average ~€0.19 confirmed as material cost advantage.
- 3 × 400 kV corridors
- 4 EU PCI designations
- ATR path documented
Independent institutional validation — PPC Romania
Public Power Corporation acquired 9.9 hectares adjacent to the identified perimeter for a 100 MW gas-fired plant. An independent institutional investor, with its own due diligence budget, chose the same zone.
- PPC Romania · 100 MW · 9.9 ha
- December 2025 ↗ Profit.ro
Strategic Partnership Agreement signed
The Strategic Partnership Agreement was signed between the founder and the Municipality of Reșița, represented by Mayor Ioan Popa, and registered at the Reșița City Hall Registry. It formalises the reservation framework for ~3 ha, commits the Municipality to a documented cooperation calendar, and binds both parties to Romanian and EU law. Full document under NDA.
- Signed 27.03.2026
- Registered · City Hall
- Full document · NDA
Resita Data Infrastructure SRL incorporated
Company registered with Romania's Trade Registry (CUI 54450187 · J2026023286005 · CAEN 7112).
- CUI 54450187 · J2026023286005
- CAEN 7112
Institutional Support Letter — Nr. 366/15.04.2026
Mayor Ioan Popa issued the Institutional Support Letter on official letterhead of Direcția pentru Administrarea Domeniului Public și Privat, confirming the municipal mandate and inviting development partners and investors to contact the company.
- Nr. 366 / 15.04.2026
- Official letterhead · stamp
Outreach — municipal land allocation procedure initiated
Active developer and investor outreach. LOI received from an infrastructure fund. Municipality has initiated the formal land allocation procedure. PUZ (Zonal Urban Plan) currently under elaboration.
- LOI received · NDA
- Developer outreach · active
- PUZ · under elaboration
PUZ · ATR · land · AC · EIA · construction
PUZ approval. Formal ATR grid study (6–12 months · ANRE 59/2013). Municipal HCL vote, ANEVAR valuation, public tender, definitive contract. Building Permit (AC). EIA. Construction — all partner-led.
- PUZ · in elaboration
- ATR · 6–12 months
- Land · public tender
- AC + EIA + Construction · partner-led