Project history · Updated March 2026

The Story Behind
This Site.

Resita Data Infrastructure SRL did not appear overnight. This project has an 18-month history of site research, grid documentation, and institutional engagement. This page exists to give serious partners the context they need to evaluate our credibility.

All milestones marked as confirmed refer to publicly verifiable facts or formally registered documents. Future milestones are presented as generic phases — specific timelines are disclosed under NDA to qualified partners only.

Request Partner Briefing View Full Validation →

Current project status — March 2026

Institutional-grade origination. LOI received. Partner selection underway.

The foundational work — grid documentation, site identification, institutional engagement — is done. What is needed now is a development partner or infrastructure fund to lead the ATR grid study, land acquisition process, and construction.

Grid adjacency✓ Documented — public records
Industrial zoning✓ Confirmed — no rezoning needed
Municipal processFormally initiated — ongoing
ATR grid studyPending — first step with partner
Company registrationIn process — 2026
Investor outreachActive — March 2026

Project Timeline

From the first site identification to the current stage. Every milestone is dated and its status marked.

Phase 1 — Site Identification & First Agreements · Q3–Q4 2024
Q3 2024
Confirmed

Site identification — Valle Terovei, Reșița industrial zone

The Valle Terovei industrial zone in Reșița was identified as a viable data center site. The decisive factor: direct adjacency to the Transelectrica 400/220/110 kV substation then under active upgrade by Siemens Energy, Electrogrup and Retrasib — a €multi-million public infrastructure investment in progress. Confirmed industrial zoning required no rezoning. Initial grid feasibility analysis commenced using ENTSO-E public records and Transelectrica PDRET planning documents.

Q3–Q4 2024
Confirmed

EU regulatory framework analysis

Systematic mapping of the EU energy infrastructure framework applicable to the site: TEN-E Regulation (EU) 347/2022, ENTSO-E TYNDP Project 144 PCI designations (Mid Continental East Corridor, Trans-Balkan Electricity Corridor), ANRE Order 59/2013 ATR grid study procedure, OUG 24/2022 strategic investment pathway. The legal and regulatory basis for the project was established before any institutional engagement.

Oct 2024
Confirmed

Confidentiality agreement signed — Municipality of Reșița

A formal confidentiality agreement was signed between the project initiator and the Municipality of Reșița, establishing the institutional cooperation framework. This document — executed with official municipal signature and stamp — confirmed the municipality's strategic interest in attracting data center investment and the project initiator's role as delegated coordinator.

Nov 2024
Public record

Transelectrica 650 MVA substation upgrade confirmed operational

Transelectrica officially commissioned the upgraded 400/220/110 kV substation at Reșița — 650 MVA installed capacity (400/220 kV: 400 MVA + 400/110 kV: 250 MVA), upgraded by Siemens Energy, Electrogrup and Retrasib. This public event confirmed the core technical thesis of the project: the grid node was real, operational, and among the most strategically positioned in Southeast Europe. Source: Economica.net, November 2024.

Phase 2 — Documentation & Market Research · Q4 2024 – Q3 2025
Q4 2024 – Q1 2025
Confirmed

Grid infrastructure research — full documentation

Systematic documentation of all public grid infrastructure relevant to the site: Porțile de Fier–Reșița 400 kV line (117 km, operational April 2024), Reșița–Pančevo double-circuit interconnector (131 km, 2×1,380 MVA, cross-border capacity +80%, both circuits operational January 2025), Transelectrica PDRET 2024–2033 (€1.9B national grid plan, Reșița designated priority node on Banat Axis). Four EU PCI designations under ENTSO-E TYNDP Project 144 documented and cross-referenced.

Q1 2025
Confirmed

Domain resitadata.com registered — digital infrastructure secured

The domain resitadata.com was registered and secured. Email infrastructure established (office@resitadata.com, investors@resitadata.com). Initial digital presence built. This marked the transition from research phase to active project development.

Q1–Q2 2025
Confirmed

Financial modelling & investor documentation

Full investor documentation package constructed from the ground up: site financial model (development cost scenarios, capex/opex benchmarks for 50–200 MW DC campus), EU market analysis (CBRE 2025 institutional investor survey, EUDCA demand forecasts, Mordor Intelligence Romania CAGR data), risk register, EU regulatory pathway map. Documentation structured specifically for institutional due diligence by data center developers and infrastructure funds.

Q2–Q3 2025
Confirmed

Website development — multiple iterations

resitadata.com underwent extensive development over multiple design and content iterations. The site was rebuilt and refined to meet institutional investor standards: claim-by-claim validation with public sources, multi-language support (EN/ES/FR/RO), mobile-first architecture, structured data (schema.org), and a contact system designed to filter qualified corporate inquiries. Over 8 major content versions were produced before public launch.

Q3 2025
Confirmed

Target partner research — developer & investor identification

Systematic research into potential development partners and capital introducers: European data center operators, colocation developers, infrastructure funds active in CEE markets, City of London capital introduction channels. Partner profiles, approach strategies and NDA documentation framework developed. Outreach preparation completed.

Phase 3 — Validation & Institutional Agreements · Q4 2025 – Q1 2026
Dec 2025
Public record

PPC Romania acquires 9.9 ha adjacent — independent validation

Public Power Corporation — Greece's largest energy company, formerly Enel Romania — acquired 9.9 hectares in the same Valle Terovei industrial zone, adjacent to the site identified by Resita Data Infrastructure SRL, for a 100 MW gas plant. This was an entirely unsolicited, independent institutional decision confirming the zone's suitability for large-scale energy infrastructure investment. Source: Profit.ro, December 2025.

Q4 2025 – Q1 2026
Confirmed

Company incorporation prepared — Resita Data Infrastructure SRL

Articles of association, CAEN activity codes, corporate governance structure, and registered address formally prepared for incorporation of Resita Data Infrastructure SRL under Romanian company law (Legea 31/1990). CAEN principal code: 7112 (engineering activities and technical consulting). Company formation process submitted. CUI (fiscal registration number) pending issuance — registration in progress at the time of writing.

Mar 2026
Confirmed · Registered

Strategic Partnership Agreement — Municipality of Reșița · March 2026

A Strategic Partnership Agreement for the Reșița Data Center — AI Digital Infrastructure project was formally signed and registered at the Reșița City Hall Registry (March 2026). The agreement formalises the institutional cooperation framework, confirms Resita Data Infrastructure SRL as the delegated project coordinator, and initiates the formal municipal process for site allocation — subject to all required legal procedures including public tender and Local Council vote. Full document available under NDA to qualified partners.

Mar 2026
Confirmed

resitadata.com officially launched — active investor outreach begins

After 18 months of research, documentation, and preparation, resitadata.com was officially launched in March 2026. The site presents the full validated case for the Reșița site: grid infrastructure (public records), industrial zoning, market context, partner profiles, and the full validation ledger. Formal outreach to data center developers, infrastructure funds, and capital introducers commenced immediately upon launch.

Phase 4 — Active · March 2026 (current)
Now
In progress

Active investor & developer outreach

Direct outreach to data center developers, colocation operators, and infrastructure funds underway. Capital introduction broker engaged. Full NDA documentation package dispatched to qualified prospects. All inquiries via investors@resitadata.com — corporate email required.

Now
In progress

Municipal formal process — initiated, ongoing

The formal municipal process for land allocation has been initiated following the signed cooperation agreement. This is a legally structured procedure governed by Romanian administrative law — subject to public tender and Local Council vote. No outcome is predetermined. No construction permits have been issued.

Now
In progress

Resita Data Infrastructure SRL — company registration in progress

Company registration filed at the Romanian Trade Registry (Registrul Comerțului). CUI (fiscal identification number) pending issuance. Upon registration, the company will formally ratify the Strategic Partnership Agreement as a legal entity, replacing the current individual pre-contractual arrangements. The company operates under the name Resita Data Infrastructure SRL (Romanian: Resita Data Infrastructure SRL). Deadline for registration: September 2026.

Why This History Matters

Site origination is invisible work. This is what has been done — and what it means for a development partner entering today.

18 months

Ground-level knowledge

Site selection, grid documentation, institutional relationships, and regulatory mapping — all already done. A developer entering today skips 12–18 months of discovery work that typically precedes any serious site evaluation.

Public record

Everything is verifiable

Every factual claim on this site links to a public source — Transelectrica, ENTSO-E, Eurostat, Profit.ro. The grid infrastructure is real. The industrial zoning is real. The adjacent PPC acquisition is real and independently verifiable.

March 2026

Registered. Documented. Moving.

The Strategic Partnership Agreement is a formally registered document. The project is not a concept deck — it is an active origination initiative with institutional engagement, documentation, and a clear path to execution. Full document available under NDA.

Ready to evaluate this opportunity?

Full documentation — grid analysis, financial model, site brief, partner framework — available under NDA to qualified developers and investors.

Request NDA Briefing Partner Framework →