Walk the actual land and the actual grid node — photographed, not rendered
31 original photographs, one per genuinely distinct angle, picked from the full on-site shoot of 8 October 2026 (which ran to roughly 150 frames) — no renders, no stock imagery. They retrace the actual walk from the road access point, through the substation, along the trail, and out into the open parcel. Filter by what you want to see.
calculated centre of the perimeter45.34811401, 21.91218642 →
KML reference point, inside the perimeter; it is not the boundary
10 perimeter vertices
- 1. 45.34757668, 21.91382212
- 2. 45.34758694, 21.91351237
- 3. 45.34757400, 21.91329349
- 4. 45.34752791, 21.91290809
- 5. 45.34737106, 21.91188669
- 6. 45.34731050, 21.91145508
- 7. 45.34829766, 21.91056074
- 8. 45.34916640, 21.91184113
- 9. 45.34906218, 21.91223805
- 10. 45.34754270, 21.91404874
The map shows the centre only; the perimeter itself is drawn in the plan below. Opens in Google Maps.
This perimeter comes from a topographic survey file (KML) the landowner provided. It is not an official cadastral extract and is not tied here to a cadastral parcel number. Its geometric area is about 29,990 square metres (2.999 hectares) on the WGS84 ellipsoid, consistent with the 30,000 square metre figure used elsewhere on this site (a difference of about 0.03 %).
Full presentation. 98-second walk-through: the land, the grid node, the substation, access and surroundings. 960×540, ~15.6 MB, with English voiceover (ElevenLabs), burned-in subtitles, footage matched to each line of narration, and a direct close for site-evaluation conversations, loads only on play. A 22-second short cut is also available: resumen_terreno_estacion.mp4.

What a 49-year concession actually gives you
Municipal land tenure under Romanian administrative law offers long-term security with a lower initial capital commitment than outright acquisition. The Municipal Council has approved awarding a 49-year concession (confirmed by phone, 8 October 2026); the written resolution and final signature by the SRL are still pending. A separate route to buy the land is also under discussion with the municipality; no purchase option exists and no price is fixed.
The land today. The campus it becomes.
The site photography shows the actual parcel area; 400 kV transmission towers are visible in the field documentation, and the renders show Phase 3–4 campus development on this same terrain.
These visualisations are architectural concept renders, not an approved design; the actual build-out is subject to partner engagement, final concession signature, ATR completion, and planning approval. The site photography is of the actual parcel at Calea Caransebesului Km 7.5, Resita.
That's the real state of it. If it fits, talk to us.
No confirmed MW yet. Concession signature still pending. A real land position next to a live substation. If that's what you're looking for, get in touch. If it isn't, no hard feelings.